Toronto and Region Conservation Authority
The Canyon Avenue Bank Stabilization Project involves the widening of the channel and construction of an armourstone retaining wall to protect infrastructure at the top of the slope.Scope of work includes: ESC measures; installation of access; staging/stockpiling; construction of wall; earthworks; granular base; landscape restoration (plantings, topsoil, seed, sod, etc.). Participation in this RFT solicitation is subject to successful prequalification under RFPQ No. 10043326 – Request for Pre-Qualification for Erosion Control, Slope Stabilization and Infrastructure Construction Works. This Tender call is eligible exclusively to Bidders prequalified under Category A1.
Standard RFP Response Requirements
Requirements may vary. Always read the full RFP carefully.
Documents
RFP Details
Browse Similar
Find more Water & Wastewater RFPs