About this RFP
The City of Port Coquitlam (the “City”) is seeking information from qualified engineering consultants, technology providers, and other organizations with demonstrated experience in anaerobic digestion (AD) to inform the Phase 2 Kingsway Green Energy Corridor Feasibility Study. The City initially identified the opportunity to develop a District Energy System (DES) along the Kingsway corridor between Downtown Port Coquitlam and the Mary Hill Bypass. This concept would be implemented in two phases: Phase 1: A low temperature DES based on wastewater heat that would feed an identified localized City-owned facility to startPhase 2: A Regional Resource Recovery Centre (R3C) based on anaerobic digestion that could produce high-grade heat for industrial consumers along Kingsway or support another beneficial end use (Biogas, RNG, CHP, etc.) (Approx. 50,000 tonnes/year dried bio-solids/food waste) The proposed R3C may incorporate anaerobic digestion of municipal, industrial, commercial, and institutional (ICI) organic feedstocks to produce biogas, offset greenhouse gas (GHG) emissions, and support local renewable energy production. The resulting biogas may be used for renewable natural gas (RNG) production, combined heat and power, direct thermal use, or another end use. The City will also consider opportunities for the beneficial management and use of digestate and other process residuals.
Dates
What to Include in Your Response
The parts a response to a municipal RFP usually needs, and what each one should cover.
Sign in to see what to includeInterested in this RFP?
Questions and submissions go through the bid portal.
Sign in to open the bid portalDocuments
The documents are on Port Coquitlam's bids&tenders portal (portcoquitlam.bidsandtenders.ca).
RFP Details
Browse Similar
Find more Energy & Utilities RFPs
New RFPs, by email
Never miss a tender. One email a week with new municipal RFPs, in time to bid.
From muniSERV. Unsubscribe any time. Who we are →
