Region of Peel
The Clarkson WWTP Primary Clarifier No. 3 Travelling Bridge Replacement project (Tender 2026-229T, Project 14-2930) involves replacing the existing travelling bridge mechanism with a new single-drive travelling bridge system, new control panel, and full integration with the plant SCADA system via a dedicated wireless gateway; the scope also includes removing existing equipment, replacing auxiliary components (running rails, conductor bar system, scum cross-collector, inlet baffles, scum baffles, weir plates, and groundwater flap gates), structural rehabilitation of the PC3 tank and Tunnel ‘F’(expansion joint sealant replacement, crack injection, and localized concrete repairs), and associated electrical distribution modifications from MCC-6.The bid document will be posted https://peelregion.bidsandtenders.ca when available. This procurement is issued in accordance with the terms of the Comprehensive Economic and Trade Agreement (CETA), Canadian Free Trade Agreement (CFTA), and other applicable trade agreements.
Standard RFP Response Requirements
Requirements may vary. Always read the full RFP carefully.
Documents
RFP Details
Browse Similar
Find more Water & Wastewater RFPs