Back to RFPs
Roads & InfrastructureBritish ColumbiaOpen

RFP26-15 - Guildford Way Bicycle Facility Improvements – Design

City of Port Moody

Posted 1 month ago|Closes: October 2, 2026 at 2:00 PM PT|Questions due: September 16, 2026 at 2:00 PM PT|0 views

About this RFP

The City of Port Moody (the “City”) is seeking a professional engineering Consultant (the “Consultant”) with the capability, capacity and experience to act as the Engineer of Record (the “EoR”) for Guildford Way Bicycle Facility Improvement works on Guildford way between Ioco Road and Coquitlam border, and pilot project on Murray Street between Ioco Road and Klahanie Drive (west).

Dates

Posted
August 26, 2026
Closing
October 2, 2026 at 2:00 PM PT
Questions Due
September 16, 2026 at 2:00 PM PT

What to Include in Your Response

Standard RFP Response Requirements

  1. 1
    Company Overview: Brief description of your firm, years in business, and relevant experience
  2. 2
    Team Qualifications: CVs or bios of key personnel assigned to this project
  3. 3
    Relevant Experience: 2 to 3 case studies of similar municipal projects completed
  4. 4
    Project Approach: Your methodology and approach to the specific requirements
  5. 5
    Project Timeline: Proposed schedule with key milestones
  6. 6
    Pricing & Fees: Detailed fee breakdown (hourly rates, fixed fee, or both)
  7. 7
    References: Minimum 3 municipal references with contact information
  8. 8
    Insurance & Certifications: Proof of required insurance and any relevant certifications
  9. 9
    Conflict of Interest Declaration: Statement confirming no conflicts exist
  10. 10
    Specific Requirements: Any specific requirements mentioned in the RFP description above

Requirements may vary. Always read the full RFP carefully.

RFP Details

Category
Roads & Infrastructure
Province
British Columbia
Municipality
City of Port Moody
Views
0

Browse Similar

Find more Roads & Infrastructure RFPs

Browse Roads & Infrastructure