Regional District of Central Okanagan
Summary:Through this Request for Proposals (“RFP”), the Regional District of Central Okanagan (the “District”) invites Proposals from suitability qualified and experienced companies, interested in performing work to supply, install, test, and commission upgrades to the Fermented Primary Sludge (FPS) pump at the Westside Regional Wastewater Treatment Plant (WRWTP). Full details of the upgrade works are provided in the Drawings and Specifications of this RFP. A brief summary of the Work is as follows:• Phased demolition of the existing fermented sludge pump and associated piping. • New concrete equipment pads.• Supply and installation of new fermented primary sludge pumps (x2), grinders (x2), and associated piping, valving, and equipment. • Note: the supply and installation of power feeds and electrical breakers, programming, and integration will be completed by others. Location: The Place of the Work is the Westside Regional Wastewater Treatment Plant (WRWTP), located at 4261 Gellatly Road South, West Kelowna, BC, as shown on the Drawings.Contract Time: The following are key Milestone Dates required for the Work:• The Work may commence anytime after: November 30, 2026• The Work must be Ready-For-Takeover no later than: August 31, 2027Form of Contract: The Form of Contract to be executed between the District and the Contractor for the Work will be the CCDC2 – 2020 Stipulated Price Contract, as modified by Supplementary Conditions. Full details on the Work and how to submit a proposal are contained in the attached RFP documents.
Standard RFP Response Requirements
Requirements may vary. Always read the full RFP carefully.
Documents
RFP Details
Browse Similar
Find more Water & Wastewater RFPs