Township of Perth South
Construction of a new municipal drain to be called the Murray Drain - Vanstratten Cut-Off Drain. The proposed work consists of installation of 503m of 450 to 525mm tile.Construction of a new municipal drain to be called the Kiry Drain including a Van Nes branch. The proposed work consists of installation of 1797m of 450 to 750mm diameter concrete field tile and HDPE sewer pipe, including related appurtenances.Improvements to the Ballantyne Drain. The proposed work consists of 330 lineal meters of open ditch cleanout including quarry stone rip-rap bank protection, rock chutes, construction of road culverts under Line 29 and sediment basins.
Standard RFP Response Requirements
Requirements may vary. Always read the full RFP carefully.
Documents
RFP Details
Browse Similar
Find more Water & Wastewater RFPs