Back to tenders
Roads & InfrastructureOntarioClosed

Joe Allore Bridge Replacement

Posted 3 years ago|Closed: March 1, 2023

About this RFP

Work of the contract includes, but is not necessarily limited to the following: removal of existing bridge structure, construction of new concrete foundations, installation of pre-engineered modular steel girder bridge, reconstruction of the bridge approaches included the installation of steel beam guide rail.

Tender documents may be obtained for no fee in the attached PDF or from www.tweed.ca.

Lowest or any tender not necessarily accepted.

Questions about this tender, please direct to the engineer, Matt MacDonald, P.Eng., Project Manager, Jewell Engineering Inc. (matt@jewelleng.ca or 613-969-1111).

Submissions will be accepted until March 1, 2022 at 2:00 pm by Manager of Public Works, Allan Broek. Public bid opening will be held as close to after 2:00 pm on the day of tender closing in the Council Chambers.

Dates

Posted
February 7, 2023
Closing
March 1, 2023

This tender has closed

Submissions closed March 1, 2023. It is kept here as a record of what this municipality has put out to tender.

Browse open tenders →

Documents

muniSERV does not hold the documents for this tender. The full package is on the municipality’s own procurement site or the tendering service named in the description above. Any link there will take you to it.

RFP Details

Category
Roads & Infrastructure
Province
Ontario

Browse Similar

Find more Roads & Infrastructure RFPs

Browse Roads & Infrastructure