Request for Proposals – Délı̨nę Arena Modernization Phase 3 (Building Envelope & Mechanical Upgrade)

The Délı̨nę Got’ı̨nę Government (DGG) invites qualified Design‑Build contractors to submit proposals for the Délı̨nę Arena Modernization – Phase 3.

This final phase replaces the existing exterior building envelope with an insulated metal‑panel system and installs a new mechanical ventilation and dehumidification system, fully integrated with the arena’s new CO₂ ice plant. The project will upgrade the facility from an uninsulated cold‑shell to a fully conditioned, code‑compliant arena capable of year‑round ice use.

Scope highlights:
• Complete insulated building envelope (roof and wall panels)
• Structural reinforcement per engineered drawings
• Mechanical ventilation with ERVs, desiccant dehumidifiers, and CIMCO controls integration
• Electrical, controls, and civil work

Reference documents (structural as‑builts, engineering analysis, mechanical equipment list) are available to registered proponents.

Key dates:
• RFP issued: July 15, 2026
• Closing: July 30, 2026 at 4:30 PM MST

All inquiries to [email protected]. The lowest‑priced proposal will not necessarily be accepted; the DGG seeks greatest overall value, including demonstrated northern experience, local employment, and training commitments.