The Township of Carling is proposing construction of a new Community Centre. The Municipality is seeking to engage the services of a qualified design build firm or team to provide professional services for the final design, shop/fabrication drawings and complete construction of Community Centre. The building will be constructed at 2 West Carling Bay Road, Nobel, just north of Parry Sound.
This Request for Proposal invites Contractors to submit a ‘PROPOSAL’ that clearly identifies the contractor’s ability, through its professional services and construction experience, to design and build a new facility in accordance with the current codes and practices. Much of the Engineering and Design has been completed and should be used as the basis for any proposal.
Enclosed with this Request for Proposal document is a detailed request for the building and components that the Municipality expects will be provided. Alternatives method of construction and materials may be presented within the proposal with cost implications identified. Any deviation from the current drawings or specifications must be clearly identified in the proposal. Final design drawing, specifications, and equipment models will be defined by the Contractor’s design team for approval by the Owner.
The main Request for Proposal full PDF can be downloaded below but please also download the following 371 page appendix PDF: Appendix G


